A furniture quote is only comparable once it states the same terms, the same packaging and the same assumptions. These are the four lines that quietly change the real cost.
1. Unit price terms (Incoterms)
EXW, FOB, CIF and DDP place very different amounts of cost and risk on you. A low EXW number is not comparable to a DDP number. Ask every factory to quote on the same basis, and confirm what the named port or place is.
2. Carton and CBM
Freight is driven by volume. Each carton has a cubic-metre (CBM) figure, and a container only holds so much of it. A 40-foot high-cube container has roughly 76 cubic metres of internal volume, and usable loading is lower in practice. Flat-pack and knock-down engineering can change your landed cost far more than a small ex-works price difference.
3. MOQ and ordering structure
Minimum order quantities may apply per model, per colour, per fabric or per container. Clarify which, and whether mixed-model containers are allowed.
4. Samples, lead time and tolerance
- How long does a pre-production sample take, and who pays for it?
- What are the production lead time and the payment milestones?
- What dimensional and colour tolerances are acceptable?
- Is there a pre-shipment inspection, and who performs it?
Put the answers in writing and compare factories line by line.
Private Sourcing Concierge
Need makers verified for these exact requirements?
Send us your specification and destination market. We shortlist verified makers and introduce you directly.
Request a shortlist